higher education
napier university, sighthill
project context
redevelopment and expansion of the sighthill campus for the faculty of health, life and social sciences, combining new construction with refurbishment of a retained spine block.
my contribution
- initially led preparation of the sanitary package within the project team.
- subsequently contributed to the wider internal works team, developing details, drawing packages and reports for tender, production and construction.
project credits and scope
architectural practice: rmjm. this period spans my professional qualification; i became arb registered in march 2009. the role description reflects that timing.
the images are project-team material reproduced from my professional portfolio. my own responsibilities are described above; project and image authorship extends beyond my individual contribution.